[CNPC signs strategic cooperation agreement with China Datang Corporation]On November 11, 2026, China National Petroleum Corporation and China Datang Corporation signed a strategic cooperation agreement in Beijing. Both sides will strengthen communication and docking, leverage their respective advantages, deepen practical cooperation in fields such as electricity, natural gas, and new energy, focus on improving the resilience and safety level of industrial and supply chains, accelerate the construction of a new energy system, and work together to make new and greater contributions to building an energy powerhouse.Editor/Gong Ziwei
On November 10, 2026 local time, the road design and construction project for the Sacklepi to Tapita section of the southeastern corridor in Liberia, undertaken by China Railway Seventh Bureau Overseas Company, was issued a preliminary acceptance certificate by the infrastructure implementation unit of the owner's Public Works Department. The main project has been substantially completed and entered the defect liability period. The project is 61.33 kilometers long and adopts a design build transfer model.Editor/Cheng Liting
On November 10, 2026, the Jiaxing Transportation Construction Engineering Industry Workers' Living Environment Improvement Conference was held in Tongxiang. Attendees observed the G60 Shanghai Kunming Expressway Tongxiang Gaoqiao section reconstruction project on site. At present, the project has completed an investment of 2 billion yuan, which is 88.5% of the annual plan, and the lower structure of the bridge has been fully deployed. This 13.7-kilometer high-speed reconstruction line will release passage space for Shanghai Hangzhou high-speed railway related projects. After completion, it can release nearly 6400 acres of development land to support the construction of Tongxiang High speed Railway Industry New City. Editor/Cheng Liting