[China Road and Bridge signs the Naivasha to Malaba meter track project in Kenya] <p>Recently, China Road and Bridge and the Kenya Railway Bureau signed a commercial contract for the Naivasha to Malaba meter rail project in Nairobi, Kenya. It is reported that the starting point of the project is the inland container yard of Naivasha, a supporting project of the Nei-Ma Railway Phase I, and the ending point is the Kenyan border city of Malaba. The main engineering content of the project includes the construction of a 24.35 km meter gauge connection line and the renovation of the existing 465 km meter gauge. Editor/He Yuting<b label="见道logo" style="background-image: url(&quot;https://oss.seetao.com/upload/image/20240122/1022a171b1bf1b200ae8558fd16fd262.svg&quot;); display: inline-block; vertical-align: middle; background-repeat: no-repeat; transform: scale(0.7); margin-top: 0.05rem; width: 20px; height: 25px;"></b></p>
Click to see more live >>
Latest
  • 2026.11.11 14:30
  • [Shanghai Ships HT700R Turbine Rotor to Huaneng Yuhuan Power Plant]
  • The fourth phase of Huaneng Yuhuan Power Plant has completed the delivery of the world's first 650 ℃ coal-fired demonstration unit HT700R steam turbine rotor in Shanghai. The rotor adopts domestically produced high-temperature alloy and collaborates with multiple units to tackle the challenges of the entire chain, marking the emergence of new materials from the laboratory and laying a solid foundation for the timely production of core components for this national major scientific and technological research project. Editor/Min Jing
  • 2026.11.11 14:30
  • [CR21G Completes Topping-out of Signal Building at Burekai Station]
  • The main structure of the signal complex building for the railway from Yining City to Aksu City in Ili Prefecture, constructed by CR21G, has been topped out, making it the first topped out signal building on the entire line. The project is located near the operating line, with strict construction control measures. After the completion of the railway from Yining City to Aksu City in Ili Prefecture, it will fill the gap in the Tianshan Railway, weave a large railway network in Xinjiang, and reduce logistics costs between the north and south of Xinjiang. Editor/Min Jing
Share

Retrieve password

Get verification code
Sure