Construction Frontline
New start! New contract with China Harbour Indonesia
Seetao 2021-01-14 11:48
  • The main work content of the project includes a dedicated dock for bulk carriers and a shipping trestle
Reading this article requires
3 Minute

The start is the war, and the start is the climax. On January 7, 2021, China Harbor signed a contract for the 180,000-ton bulk carrier special terminal project in La Bota Port Area, Qingshan Industrial Park, Indonesia, with a construction period of 10 months. The owner is the Qingshan Park Development Co., Ltd. of the Indonesian Economic and Trade Cooperation Zone.

The project is located in Central Sulawesi Province, Sulawesi Island, Indonesia. The main work content of the project includes a dedicated 180,000-ton bulk carrier wharf (including 2 approach bridges and 1 trestle bridge) and a heavy cargo wharf emergency trestle.

The project is a supporting port for Indonesia's largest ferronickel industrial park (Qingshan Ferronickel Park). The signing of the project further deepens the cooperation relationship between the company and the owner, and is conducive to consolidating the company's market position in the Indonesian national maritime engineering field. Editor/Sang Xiaomei

Comment

Related articles

Construction Frontline

African Development Bank injects funds into Namibia's green hydrogen project

12-12

Construction Frontline

China Kazakhstan drone cooperation accelerates intelligent transportation in Central Asia

12-11

Construction Frontline

China Civil Engineering and EDR sign technical agreement

12-10

Construction Frontline

Hungary Serbia Railway officially announces full line opening in early 2026

12-10

Construction Frontline

Oriental International supports Kyrgyzstan substation project

12-09

Construction Frontline

Chinese enterprises win bids for infrastructure projects in Chile, Lesotho, and Laos

12-09

Collect
Comment
Share

Retrieve password

Get verification code
Sure