Construction
Heruo Railway completed the docking of the last rail of the whole line
Seetao 2021-11-16 17:32
  • The smooth connection of the last rail of the Heruo Railway line will lay the foundation for the opening of 2022
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
Â
1x
    • Chapters
    • descriptions off, selected
    • captions off, selected
      Reading this article requires
      2 Minute

      Recently, at the construction site of the Heruo Railway in Minfeng County, Xinjiang, with the last rail joint of the whole line, the welding was successfully completed, and the whole line of Heruo Railway has been seamlessly connected, forming a thousand miles of rail.

      More than a month ago, the Heruo Railway, the Gekko Railway, the Kahe Railway, and the Southern Xinjiang Railway successfully "hand in hand", and the world's first circular railway around the desert "painted" a circle in the Taklimakan Desert.

      Heruo Railway is a seamless track design. The seamless track has the advantages of reducing train running resistance, reducing train vibration and noise, etc. The stability of train operation will be greatly improved, and the train will run smoothly and safely when passing through, and passengers will be on the train. It will not feel bumpy either.Editor/Baohongying

      Comment

      Related articles

      Construction

      Hebei TV praises Shantui's intelligent construction products

      05-08

      Construction

      The track laying of the Xiangyang-Jingzhou High-speed Railway has started!

      03-18

      Construction

      Shuangyashan Green Aviation Fuel Base officially launched

      10-16

      Construction

      The autumn centralized construction of China's first heavy-duty Daqin Railway

      10-08

      Construction

      The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

      09-30

      Construction

      Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

      09-29

      Collect
      Comment
      Share

      Retrieve password

      Get verification code
      Sure