Municipal
Inner Mongolia Jing'an 3.5 million tons stainless steel project started
Seetao 2022-04-02 14:05
  • After the project reaches production, it will continue to enhance the resilience and competitiveness of the industrial chain
Reading this article requires
3 Minute

On April 1, 2022, the stainless steel rolling and pickling project of Inner Mongolia (Naiman) Jing'an Nonferrous Metal Materials Co., Ltd. officially started construction.

According to reports, the stainless steel rolling pickling project plans to invest 5.69 billion yuan, with an annual output of 3.5 million tons of stainless steel coils. It adopts international advanced continuous casting and rolling technology, and builds 3 single-machine single-strand continuous casting machines; 1450mm and 1050mm steel rolling 1 production line and supporting public and auxiliary facilities; 4 new hot-rolled stainless steel annealing and pickling production lines, 1 five-stand cold-rolling production line, 2 cold-rolled stainless steel annealing and pickling production lines and public and auxiliary facilities.

The stainless steel rolling and pickling project started this time is an extension chain project of a nickel-based green circular economy industrial cluster. After the construction of the entire industrial chain of the security company is completed, an investment of more than 18 billion yuan will be completed. After the entire industrial chain is put into production, the annual industrial output value will be more than 100 billion yuan, the tax revenue will be more than 5 billion yuan, and more than 10,000 people will be employed. Editor/He Yuting

Comment

Related articles

Municipal

Over 2.24 billion yuan! Two key engineering projects in Fujian have successfully won bids

03-16

Municipal

The dust of Chongqing's 20 billion yuan project has settled!

02-24

Municipal

The fourth generation residential project in Huahu, Ezhou has started construction

02-08

Municipal

Gansu Guanshan Scenic Area Cultural and Tourism Project EPC Bid Opening

12-29

Municipal

25800 pieces! Exceeding the deadline for the renovation of old residential areas in 2025

12-26

Municipal

Gezhouba Ankang 6.9 billion yuan ecological governance big deal

12-18

Collect
Comment
Share

Retrieve password

Get verification code
Sure