Business promotion
Yellow River Hydropower Creates a National Clean Energy Highland
Seetao 2022-10-15 10:11
  • Talatan 1000 MW photovoltaic power station was selected as the first typical super project case in China's power engineering world
  • Taking root in Qinghai's new energy industry, the Yellow River Hydropower Station has built the world's largest water light complementary photovoltaic power station in the desert and Gobi region
Reading this article requires
10 Minute

The construction of ecological civilization has been vigorously promoted, making great strides in building a beautiful China. Photovoltaic ocean with layers of "ripples" and the bright pearl of the Yellow River with "green electricity" surging up. Decorate the vast field, beautiful and clean every corner of the power.

Develop low-carbon industries

Talatan, Gonghe County, Hainan Tibetan Autonomous Prefecture, Qinghai Province, is an endless "blue ocean" on the vast field, with photovoltaic panels rippling in the sun.

A few tens of kilometers away, the Yellow River is rolling eastward. The rocks on both sides of the canyon are jagged, and huge water flows down. Longyangxia Hydropower Station, the first large-scale cascade hydropower station in the upper reaches of the Yellow River, is located here.

A 330 kV power transmission line connects the "light" of Taratan and the "water" of Longyang Gorge, thus contributing to the world's largest "water light complementary" power generation project - Longyang Gorge Water Light Complementary 850 MW grid connected photovoltaic power station of the State Power Investment Corporation, which makes Qinghai power available to Jiangsu thousands of miles away.

Take the road of innovation and development

On the National Day, a good news from the China Power Construction Enterprises Association made the staff of Hainan Branch of Talatan Upper Yellow River Hydropower Development Co., Ltd. in Gonghe County, Hainan Tibetan Autonomous Prefecture on duty excited.

The Taratan 1000 MW photovoltaic power station project, which is the power supply configuration project of Hainan Export Base in Qinghai Province and is under the responsibility of Yellow River Company, was selected as a typical super project case of "Extraordinary Ten Years · China's Power Engineering World No.1", and presented a gift to the 20th National Congress of the Communist Party of China on the special day of the birthday of the Republic.

"The selection of typical super project cases marks that Yellow River Company has reached the highest level of China's power construction projects in the field of new energy development and construction, both in terms of scale, project quality and scientific and technological level. It not only breaks the world record, but also solves the technical problems in the industry, effectively guarantees the national energy security, and further solidifies our unswerving commitment to ecological priority, green development and high-quality development We have the determination and confidence to innovate and share the road of development. " Su Xiaojun, general manager of New Energy Construction Branch of Huanghe Company, said.

In the process of construction management and project excellence creation of the power supply project of Hainan ultra-high voltage transmission base, Yellow River Company has applied a large number of new technologies and equipment such as "digital management platform for construction quality and safety of large photovoltaic power stations", "self power supply integrated flat single axis", "self oil pool transformer device", etc. to make more than 7 million photovoltaic modules, 646 fans, 6 330 kV booster stations Five 110 kV booster stations and 32 35 kV collection stations have "firmly rooted" in the desert Gobi on the Qinghai Tibet Plateau.

From the barren land without grass all the year round to the "light sea" with full sense of science and technology built by "taking advantage of" energy gathering; Since the first photovoltaic panel was built on Tara Beach in 2012, Tara Beach Ecological PV Park is now planned to cover an area of 609 square kilometers; From a desert to the construction of the world's largest water light complementary photovoltaic power station... Wu Shipeng, Deputy Manager of the Industrial Park Project Department of Hainan Branch, has always been here to guard this "photovoltaic ocean".

"I still remember that when I first came to Tara Beach, there were flying sand and rolling stones, and there was no grass. Now, there is a lot of green under photovoltaic panels. Since the Yellow River Company built and operated photovoltaic power stations here, everything has gradually improved. Water and soil have been conserved, pasture planting has achieved results, and herdsmen have also gained more income. It is really killing three birds with one stone." Wu Shipeng said that with the rise of photovoltaic power generation, he witnessed the change of Tara Beach, and witnessed that Yellow River Company has pioneered the coordinated operation of traditional energy and new energy in the world.Editor/Ma Xue

Comment

Related articles

Business promotion

Technology drives Weichai hydraulic power to expand overseas new version map

12-13

Business promotion

MLM quadruped robot achieves complex operations while moving

12-11

Business promotion

213 company passed the qualification certification audit for CRRC level suppliers

12-11

Business promotion

Aluminum Breakthrough: Bofa Project Ships 20 Million Tons in Single Year

12-08

Business promotion

Shandong Heavy Industry Weichai Group 2026 Business Conference

12-08

Business promotion

Lumos Robotics Completes Pre-A1 and Pre-A2 Round of Financing

12-08

Collect
Comment
Share

Retrieve password

Get verification code
Sure