Wind power
Inner Mongolia 4GW wind power project is about to start construction
Seetao 2023-04-26 10:02
  • The total investment of this project is 24.7 billion yuan, and it is planned to be completed and put into operation by the end of 2025
  • After completion, it will have significant environmental and energy-saving benefits
Reading this article requires
3 Minute

Recently, the 4GW wind power project of Inner Mongolia Huadian Tengger Base has been officially approved and approved. It is reported that this project is an external power transmission project, and all the generated electricity is sent to the area for consumption.

It is reported that the site of the 4GW wind power project is located about 53km southwest of Bayanori Gongsumu on the west side of Alxa Left Banner. The terrain of the site is flat and open, with a terrain of Gobi. The region is rich in wind resources, with an annual average wind speed of 6.5m/s to 7.0m/s at a height of 120m. The total installed capacity of this project is 4GW, with a planned investment of 24.7 billion yuan. It is planned to be put into operation by the end of December 2025.

After the completion of the project, it will not only provide power, reduce pollution, save resources, have positive social and environmental significance, but also have the ability to repay debts. The financial internal rate of return of capital fund is good, and the project is feasible in economic, social and environmental benefits. Editor/He Yuting

Comment

Related articles

Wind power

50 billion wind power procurement announced, 10 wind turbine manufacturers shortlisted

05-04

Wind power

5500 meters! The world's highest altitude wind turbine landed in Qinghai, China

05-04

Wind power

6.356 billion! Announcement of Sino German Cooperation in Offshore Wind Power Projects

04-30

Wind power

Upgrading the transformation of offshore wind power

04-29

Wind power

Yunnan Development and Reform Commission approves two wind power projects

04-29

Wind power

47.9%! Wind and solar installations are just one step away from the 'half of the country'

04-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure