Hydropower
Guangxi Guanyang Pumped Storage Power Station is about to start construction
Seetao 2023-10-23 10:09
  • The project plans to install four reversible water pump turbine units with a single unit capacity of 300000 kilowatts
  • After the completion of the power station, it will further improve the power structure of Guangxi, effectively promoting the development of clean energy, energy conservation and emission reduction, and local economic and social development
Reading this article requires
4 Minute

On October 20, 2023, the feasibility study report review meeting for Guangxi Guanyang Pumped Storage Power Station was held in Guilin. During the meeting, representatives attended on-site inspections of the upper and lower reservoirs, exploration adits, and other areas of the Guanyang project.

HercegBosna.org • Pogledaj temu - Hrvatska gradi Nuklearnu Elektranu

Guanyang Pumped Storage Power Station is a key project implemented during the 14th Five Year Plan for the Medium and Long Term Development of Pumped Storage (2021-2035), with a total installed capacity of 1.2 million kilowatts and the installation of four reversible water pump turbine units with a single unit capacity of 300000 kilowatts. After the completion of the power station, it will further improve the power structure of Guangxi, enhance the peak shaving capacity and safe operation level of the power grid, and effectively promote the development of clean energy, energy conservation and emission reduction, and local economic and social development.

Since the launch of the project in January 2022, Southern Power Grid Energy Storage Company has actively implemented the instructions of the People's Government of Guangxi Zhuang Autonomous Region and Southern Power Grid Company to accelerate the planning and construction of the Guilin Guanyang Pumped Storage Power Station project. With the full support of the project design unit, the company has worked overtime, worked together, and overcome difficulties. The project has been promoted to complete the pre feasibility study report review in June 2022 Complete the review of three major thematic reports in November 2022.

This feasibility study report review is another milestone in the early stage of the project, laying a solid foundation for project approval. Editor/Zhao E


Comment

Related articles

Hydropower

Anhui 7.7 billion yuan pumped storage power station project won the bid

05-07

Hydropower

Excavation of lower reservoir of Zhangye Hydropower Station, Gansu Province

05-06

Hydropower

Jiangxi Suichuan pumped storage power station project approved

04-30

Hydropower

Xinjiang pumped storage project feasibility study report review meeting held

04-28

Hydropower

Guiyang hydropower station building top construction tunnel started smoothly

04-26

Hydropower

The Uma Otani Hydropower Station in Sri Lanka was officially launched

04-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure