Hydropower
Heilongjiang Yichun five star pumped storage project was officially launched
Seetao 2024-01-10 11:30
  • According to the plan, the preparation period of the project is 18 months, and the total construction period is 78 months
  • This scale will make it the largest pumped storage power station in Northeast China, providing stable and reliable power support for the regional grid
Reading this article requires
6 Minute

It is reported that Heilongjiang Yichun Five Star pumped storage power station project is the national "pumped storage medium and long-term development plan (2021-2035)" in the "14th Five-Year" key implementation project, but also the provincial and municipal key work to promote the big project, is the first Yichun city more than 10 billion big project. The construction of the project will bring significant energy benefits, economic benefits and social benefits to the region.

According to the plan, the preparation period of the project is 18 months, and the total construction period is 78 months. After completion, the installed capacity of the power station will reach 1800MW, and the designed annual power generation will reach 1.681 billion KWH. This scale will make it the largest pumped storage power station in Northeast China, providing stable and reliable power support for the regional grid.

At the launch ceremony, Li Lixin said: "Promoting the construction of five star pumped storage project is not only conducive to increasing the proportion of new energy industry in our city, promoting green and low-carbon economic development, but also conducive to ensuring grid security and improving the level of clean energy consumption." He stressed the important role of the project in optimizing the energy structure, promoting local economic development and ensuring power grid security.

The construction of the Five Star pumped storage power station in Yichun, Heilongjiang Province will make full use of the advantages of local water resources and convert water energy into electricity through advanced pumped storage technology. This green, renewable energy approach will play a positive role in reducing carbon emissions, improving environmental quality, and promoting sustainable development.

In addition, the project will also create a large number of jobs, attract related industrial chains to settle in, and further stimulate the growth of the local economy. At the same time, the completion of the project will help improve the infrastructure construction in the region and inject new vitality into the implementation of the rural revitalization strategy.

In short, the launch of the Five Star pumped storage project in Yichun, Heilongjiang, marks a solid step in the development of the green energy industry in the region. This project will become an important engine to promote the sustainable development of the local economy and inject strong impetus into the sustainable development of Yichun City. We look forward to the smooth implementation of this project, which will bring a better future to the region. Editor/Xu Shengpeng


Comment

Related articles

Hydropower

Anhui 7.7 billion yuan pumped storage power station project won the bid

05-07

Hydropower

Excavation of lower reservoir of Zhangye Hydropower Station, Gansu Province

05-06

Hydropower

Jiangxi Suichuan pumped storage power station project approved

04-30

Hydropower

Xinjiang pumped storage project feasibility study report review meeting held

04-28

Hydropower

Guiyang hydropower station building top construction tunnel started smoothly

04-26

Hydropower

The Uma Otani Hydropower Station in Sri Lanka was officially launched

04-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure