To promote local economic development, optimize the allocation of water resources, improve flood control and disaster reduction capabilities, protect the ecological environment and promote the balance of regional development. In response to the national strategic deployment of infrastructure construction, Anhui provincial government invested in the construction of Shexian section of Anhui Xin 'an River basin flood control project.
Anhui Xin 'an River basin flood control project Shexian section three sections
Construction site: Shexian County, Huangshan City
Construction scale: Anhui Xinan River basin flood control project in Shexian County is mainly composed of flood diversion channel (including the first open channel, entrance gate and fire pump house, flow barrier pier, tunnel, hidden culvert, drainage channel, exit gate, narrow open channel, wide open channel and diversion pier), rebuilt bridge, new bridge, Yangzhishui flood diversion control gate (including power distribution room, diesel power generation Machine room), fishway, embankment strengthening and raising project, bank protection project, road and management room.
This project is a medium-sized project of Class III. The dike building level is level 2, the first open channel, the middle tunnel, the hidden culvert, the tail open channel and the flood diversion control gate, the entrance gate and other permanent hydraulic buildings are level 2, the exit gate of the diversion channel hydraulic building level is level 4, the open channel slope level is level 2, and the drainage tank culvert and drainage channel on both sides of the hidden culvert hydraulic building level is level 4.
Won the first prize: China Water Resources and Hydropower Fourth Engineering Bureau Co., LTD
Tender offer: 1.49 billion (This article from the official website www.seetao.com without permission shall not be reproduced, otherwise it must be corrected, please indicate the link of the original) Jiandao network strategy column editor/Wang Tian
Comment
Write something~