Photovoltaic
Nengjian Shanxi Institute won the bid forthe370MW photovoltaic project in Brunei
Seetao 2024-05-11 10:26
  • The Brunei PMB Island Photovoltaic Power Project is located in the northeast corner of Brunei, Pular Muara Besar - PMB Island
Reading this article requires
3 Minute

Recently, Shanxi Institute confirmed the winning bid for the 370 MW photovoltaic power generation project design in Brunei.

The Brunei PMB Island Photovoltaic Power Generation Project is located on the Pular Muara Besar PMB Island in the northeast corner of Brunei. The construction site is an industrial refinery park in Brunei.

The total installed capacity of the project is 370MW, and it will be constructed in three phases. The first phase is expected to start construction in August 2024. After the completion of the project, it will greatly alleviate the electricity pressure on the factory, reduce manufacturing costs, and improve the market competitiveness of the factory's products.

This project is the first project of Shanxi Institute to enter the Brunei market, achieving a breakthrough in overseas business in a new country, demonstrating the company's outstanding international competitiveness, technological innovation strength, and leading position in the field of new energy project design.

Shanxi Institute will always adhere to the strategy of prioritizing high-quality development of international business, continuously strengthen the construction of international project teams, and provide high-level design services to overseas high-end markets.Editor/XuNing

Comment

Related articles

Photovoltaic

The power grid project of the largest Shagehuang energy base has been fully accelerated

02-26

Photovoltaic

Saudi Arabia's Acwa threw 5 billion dollars to bet on Türkiye!

02-24

Photovoltaic

Shangneng Electric Enters the Middle East: Achieves 3GW Photovoltaic Order from Arabia

02-21

Photovoltaic

Four solar energy storage projects in Egypt have been approved energy storage coming

02-21

Photovoltaic

In 2026, the newly installed photovoltaic capacity will be adjusted back to 180-240GW

02-19

Photovoltaic

When Musk's gaze turns to Chinese photovoltaics

02-16

Collect
Comment
Share

Retrieve password

Get verification code
Sure