Wind power
Huadian Group's 76.5MW+300MW wind power project equipment procurement won the bid
Seetao 2024-09-02 14:10
  • Huadian Group's wind power projects will drive the development of related industrial chains, promote employment and economic growth
Reading this article requires
4 Minute

Recently, the e-commerce platform of Huadian Group announced the important winning results of the Heilongjiang Branch of Huadian New Energy Group Co., Ltd. for the Lileng Wind Power Project, which specifically involves two wind power projects: one is a 76.5MW upgrading project, and the other is a new wind power project with a scale of 300MW, both located in Muling City, Heilongjiang Province.

Overview of the 76.5MW wind power project

The project is an equal-capacity renovation and upgrading project of Heilongjiang Huadian Muling Shiwen Wind Farm, which aims to improve power generation efficiency through the procurement of advanced wind turbines, including towers. The single capacity of the wind turbine purchased this time must reach or exceed 6MW, the hub height shall not be less than 115 meters, and the minimum distance from the blade tip to the ground shall be more than 25 meters. The project allows for the use of no more than two different models of units for mixed arrangement to optimize the layout of the wind farm.

Highlights of the 300MW wind power project

Heilongjiang Huadian Mudanjiang Muling 300MW wind power project has also simultaneously promoted the procurement of wind turbines and their ancillary equipment including towers. The project puts forward higher requirements for the performance of wind turbines, with a single capacity of at least 8MW, a hub height of more than 140 meters, and a blade tip distance of no less than 25 meters. Similar to the 76.5MW project, this project also supports a mix of no more than two types of aircraft to adapt to complex and variable wind resource conditions.Editor/Jiang Mingyue

Comment

Related articles

Wind power

343.2MW, China Electric Power Construction Hebei Institute won the bid in Tianjin

09-18

Wind power

The first wind turbine of the Erlian wind storage project has been successfully hoisted

09-18

Wind power

Construction of 188 MW wind power project in Chayouzhong Banner, Inner Mongolia begins

09-17

Wind power

Xinjiang Hami wind power photovoltaic base will soon be connected to the grid

09-16

Wind power

1.143 billion yuan! Haiwei Wind Power wins 450MW offshore wind power contract

09-14

Wind power

Yuanjing, Sany, and Yunda jointly undertake the 1 GW wind power project in Turpan

09-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure