Transportation
The first high pier of the Sichuan-Chongqing section of China's high-speed rail started!
Seetao 2025-06-05 11:34
  • The project is the first high-speed rail continuous rigid frame bridge in China with a design speed of 350 kilometers per hour
Reading this article requires
6 Minute

At 10:58 on May 21, the first pile foundation of the Caijiagou Bridge of the Yichang-Fuling section of the Shanghai-Chongqing-Rong high-speed railway along the Yangtze River (hereinafter referred to as the Yifu high-speed railway) was officially drilled, marking the start of the construction of the highest pier of the high-speed railway with a design speed of 350 kilometers per hour in China.

Caijiagou Bridge is located in Ma'an Street and Lidu Street, Fuling District, Chongqing City, the bridge is designed by the Second Institute of China Railway, China Railway Construction Bridge Bureau undertakes, with a total length of about 2006 meters, a total of 344 design pile foundations, 27 bearing caps, and 27 pier platforms. The bridge has crossed rural roads, provincial roads and other structures for many times, and the superstructure is mostly a continuous rigid bridge. The main bridge is designed as a concrete continuous rigid frame bridge with a span of (92 + 3×168 + 92) meters, and the drilling is the No. 9 pier, with a height of 165 meters, which is the highest continuous rigid bridge pier in China's high-speed railway with a design speed of 350 kilometers per hour.

The construction adopts the domestic advanced XCMG XR1600E large-scale rotary drilling rig for pile foundation construction, the design diameter of the pile foundation is 2.80 meters, and the pile length is 30.5 meters. Due to the complex geological conditions of the bridge, before construction, the project team attaches great importance to the scientific research and judgment of the geological conditions, optimizes the construction plan, and reasonably selects the construction technology and equipment.

Yifu high-speed railway is an important part of China's "eight vertical and eight horizontal" high-speed rail network along the river, the line starts from the Yichang North Station of the Wuhan-Yichang section of the high-speed railway along the Yangtze River under construction, and goes west through Enshi Tujia and Miao Autonomous Prefecture, Shizhu County, Fengdu County, Fuling District of Chongqing City, and connects to Changshou North Station of Zhengyu High-speed Railway. The total length of the new main line is about 471 kilometers, and the design speed is 350 kilometers per hour.(This article is from the official website of Seetao www.seetao.com. Reprinting without permission is strictly prohibited. Please indicate Seetao.com + original link when reprinting) Seetao.com Strategy Column Editor/Sun Fengjuan

Comment

Related articles

Transportation

China signs 28 infrastructure cooperation projects with multiple African countries

06-13

Transportation

The first single track railway in Bangladesh has been signed and landed in Chittagong

06-10

Transportation

Modi unveils world's tallest single arch railway bridge, Kashmir railway connects

06-10

Transportation

9000 tons! For the first time in the world! The trial was successful

06-09

Transportation

China Construction will undertake the construction of Kyrgyzstan International Airport

05-29

Transportation

Uber forces to pioneer initiative, integrating seamless travel through the Channel Tunnel.

05-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure