[Xinjiang Power has delivered over 35.2 billion kilowatt hours of electricity to Chongqing] On September 10, 2026, the Hami to Chongqing ± 800 kV HVDC transmission project transmitted over 35.2 billion kilowatt hours of electricity to Chongqing. The project spans 2260 kilometers, with new energy accounting for 71.83%. It can transmit over 36 billion kilowatt hours of electricity to Chongqing annually, accounting for about 20% of the total electricity consumption in Chongqing.Editor/Gao Xue
Click to see more live >>
Latest
  • 2026.10.15 11:24
  • [Liu Haixing Meets Saudi Ambassador to China Alharbi and GCC Envoys in Beijing]
  • On October 14, 2026, Liu Haixing met with Saudi Ambassador to China Halby in Beijing and had a collective exchange with the Gulf Cooperation Council's ambassadors in China. Both sides reviewed the achievements of China Saudi Arabia China Sea cooperation and exchanged views on deepening strategic mutual trust, expanding practical cooperation, and promoting peace and stability in the Middle East region. Editor/Min Jing
  • 2026.10.15 11:23
  • [Dongfang Electric Boiler Lights Up at Huaneng Haimen Project]
  • Recently, the 5th boiler of the Huaneng Haimen project, developed by DEC, was successfully ignited once. This unit is the first million kilowatt counter combustion tower boiler in China, filling the technological gap in the country. After being put into operation, it will increase its annual electricity output by 8 to 10 billion kilowatt hours and support the construction of an integrated wind solar thermal storage base. Editor/Min Jing
Share

Retrieve password

Get verification code
Sure