Transportation
Guizhou Guniuhe Extra Large Bridge is fully connected
Seetao 2026-11-18 16:05
  • After the opening of the road, the travel time between Anshun and Panzhou will be reduced
Reading this article requires
6 Minute

Between the towering Wumeng Mountains, a giant steel box truss arch bridge spans a V-shaped canyon 400 meters deep. With the last T-beam smoothly in place, the task of erecting all 113 T-beams for the Guniuhe Grand Bridge has been completed. Located in a steep canyon, the narrow site and steep terrain posed numerous challenges to the construction. The construction team overcame the difficulties and turned this world-class bridge from a blueprint into reality. The project then entered the sprint stage of ancillary works such as bridge deck paving.

World class Canyon Bridge

The Guniuhe Extra Large Bridge is located in Houchang Township, Shuicheng District, Liupanshui City, and is a core control project of the Anpan Expressway. The total length of the bridge is 881.8 meters, with a calculated span of 520 meters for the main bridge. The span of similar bridges ranks second in the world, and the distance between the bridge deck and the valley bottom is about 400 meters, ranking fifteenth in the world for high bridges. The project is located in an area with steep canyons and cliffs, and the construction space is very limited. Multiple patents and provincial-level construction methods have been produced during the construction, solving the problem of bridge building in high mountain canyons.

The National High School Project has come to an end

The Anpan Expressway is a national key project for the expansion of the Shanghai Kunming Expressway. The route starts in Anshun and ends at the border between Yunnan and Guizhou provinces, with a total length of 173.023 kilometers. It is constructed as a two-way six lane road with a designed speed of 100 kilometers per hour. At present, the overall image progress of the project has reached 99.41%, and it is planned to achieve full line operation by the end of March 2027. After completion, the travel time from Anshun to Panzhou will be shortened from 3.5 hours to 1.5 hours, greatly improving the travel conditions in the western Guizhou region. Keywords: Guniuhe Grand Bridge, Anpan Expressway, Guizhou Road and Bridge

Improve the regional transportation pattern

The completion of the bridge will clear major obstacles for the subsequent construction of the bridge deck system, guardrails, etc. This highway connects the western part of Guizhou, strengthens the high-speed connectivity between Guizhou and Yunnan, and unleashes the potential for resource and industrial development along the route. The road above the high mountain canyon once again demonstrates the strength of Guizhou's mountain bridge construction and accumulates valuable practical experience for the construction of road networks in southwestern mountainous areas.Editor/Li Xiaohua

Comment

Related articles

Transportation

Lanhe Railway launches full track laying

11-18

Transportation

Uganda Railways Plans 10 Locomotives, 100 Wagons and 22 DMUs in Fleet Renewal

11-18

Transportation

CRRC Qiqihar, Mongolia Open Financing Talks on 1,300 Freight Wagons

11-17

Transportation

Ganqingsuotongpo Yellow River Grand Bridge side span closure

11-17

Transportation

Budapest launches tender for 3.5-kilometer light rail in the north

11-16

Transportation

8.5B Yuan Coal Power EPC Locks Qinghai Green Power Supply to Guangdong

11-15

Collect
Comment
Share

Retrieve password

Get verification code
Sure