The rock tombs of Heigla are quiet against the thousand year old sandstorms, but another skeleton has been quietly arranged at the foot of the ancient city. When the number of tourists began to climb and there was still a shortage of hotel rooms, invisible foundations such as roads, water, electricity, pollution, and airports were first placed on the negotiation table - Euler no longer only sold scenery, but began selling operating rights for 15 to 35 years.

On November 17, 2026, the Royal Commission of Saudi Arabia launched six public-private partnership investment projects with a total valuation of 25.4 billion Saudi riyals, approximately 6.8 billion US dollars. Previously, only the project list was announced, and the valuation, franchise period, and release time of this project are all clear. The earliest deadline for intention registration is May 31, 2027.
Overview of the Six Major Projects
The six projects have significant differences in volume, with the secondary road and pipe gallery projects having the largest volume, while the main road, airport, water storage, solid waste, and sewage projects are planned synchronously. Each project adopts a differentiated cooperation model, with clear content for supporting construction, expansion and renovation. The airport project also comes with land development space, and the concession period for different sections ranges from 15 to 35 years.

Project mode transformation
The projects are not simple construction general contracting, and adopt multiple investment and financing operation modes. Enterprises need to comprehensively calculate the financing, construction, operation and maintenance costs, as well as payment mechanisms. This is in line with the development trend of infrastructure in the Gulf region shifting from simple construction to long-term operational cooperation, with a focus on the landing scenario of the Euler Cultural Tourism New City.
Participate in key point analysis and judgment
The project has opened an online intention registration channel with a Chinese page, but the qualification and localization requirements still need to be clarified in subsequent documents. The project is issued in batches with a long time span, and the enterprise needs to reserve sufficient time to form a consortium and implement financing. The continuous growth of Euler tourists and the planning of supporting hotel rooms will directly affect the stable cash flow of various projects. Keywords: Saudi Arabia RCU、 Infrastructure and PPP projects

Track key directions
Focus on the implementation of bidding documents, local access requirements, and the pace of hotel supporting construction in the future. Water solid waste operators, engineering general contractors, and investment and financing parties can combine their own advantages to lay out in advance and prioritize sorting out the operating income model. The core threshold of the project has shifted from engineering construction capability to long-term stable operation and revenue control.Editor/Gong Ziwei
Comment
Write something~