Transportation
Hubei Province Lichuan-Xianfeng Expressway approved
Seetao 2022-02-21 11:33
  • The total length of the project is 85.4 kilometers, with a construction period of 4 years and a total investment of 19.293 billion yuan
Reading this article requires
4 Minute

Recently, the Lichuan-Xianfeng Expressway invested and constructed by Hubei Communications Investment has been approved by the Hubei Provincial Development and Reform Commission, which indicates that the project has obtained the approval of the engineering feasibility study and is expected to start construction in 2022.

The estimated total investment of the Lichuan-Xianfeng Expressway project is about 19.293 billion yuan. It starts from Swan Pond in the west of Lichuan City and ends near Xiaomo Village, Gaoluoshan Town, Xianfeng County, and connects to the Xuanxian Expressway under construction. The main line of the project has a total length of about 85.4 kilometers, two-way four-lane, and a construction period of 4 years.

According to reports, Lixian Expressway is an important part of the vertical and nine lines in the "Hubei Provincial Highway Network Planning Outline (2011-2030)". As one of the 12 new projects planned by Hubei Communications Investment in 2022, the terrain and geology along the route are complex, the ecological environment is fragile, the engineering construction is difficult, and the technical requirements are high. At present, Hubei Communications Investment is speeding up the preliminary work and striving to start construction as soon as possible.

According to the relevant person from the Enshi Prefecture Transportation Bureau, after the completion of the expressway, the mileage from Lichuan to Xianfeng will be shortened from 2.5 hours to 1 hour, which is of great significance to building a vertical expressway in the adjacent areas of Hubei, Hunan and Chongqing, and promoting regional rural revitalization and economic and social development. . Editor/He Yuting

Comment

Related articles

Transportation

AI empowers transportation, World Transport Conference opens in Tianjin

06-05

Transportation

The Suizhou Jingmen Expressway is planned to start construction in December 2026

06-03

Transportation

The traffic in the revolutionary old areas of Gansu has undergone a transformation

06-03

Transportation

China and Kazakhstan will cancel transportation quotas by the end of 2026

05-31

Transportation

The first intercity railway R1 line in Quanzhou is under full construction

05-28

Transportation

The main project of the Pinglu Canal waterway has been fully connected

05-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure