The Syzhou Pumped Storage Power Station project is an energy project that aims to use pumped storage technology to store and release electric energy to balance the load of the grid and improve the stability and reliability of the power system. The winning result of Xuzhou pumped storage power station project has been released.
Project name: Syzhou pumped storage power station project market competition allocation investment development subject preference.
Construction site: Zhenghua Village, Xixi Town, Syzhou District, Yibin City, Sichuan Province.
Construction scale: The proposed power station hub project is composed of upper and lower reservoirs and water transmission and power generation system buildings. The upper reservoir is selected as Wuchahu Reservoir under construction, with an installed capacity of 290,000 kilowatts. The total investment of the project is expected to be about 2.4 billion yuan (excluding Wuchahu Reservoir under construction). The final construction content and investment scale of the project shall be subject to the project approval documents.
The total construction period of this project is initially planned to be 48 months, including 2 months for preparation, 38 months for construction of the main project and 8 months for completion; The generation period of the unit is 42 months. The project shall complete the review of the pre-feasibility study report within 6 months after receiving the confirmation letter from the investment development body, complete the review of the feasibility study report within 12 months, complete the approval within 14 months, and start the project within 16 months.
Bidding result: Sichuan Energy Investment Development Co., LTD.Editor/Wang Tian
Comment
Write something~