Photovoltaic
Yunnan Wuding county photovoltaic power station connected to the grid
Seetao 2024-06-14 18:41
  • After the project is put into operation, it will effectively alleviate the power supply shortage and reduce carbon emissions
Reading this article requires
3 Minute

On June 13, 2024, the Power Construction New Energy Company successfully realized the grid-connected generation of Daxinzhuang 40MW, Shangwan 40MW and Xiaoshipingou 25MW photovoltaic power stations in Wuding County, Chuxiong Prefecture, Yunnan Province, marking the official operation of these clean energy projects to provide green and sustainable power supply for the local and surrounding areas.

These three projects have made full use of the unique solar energy resources of Wuding County, contributing to the promotion of the green low-carbon transformation of the energy structure and the grand goal of reaching the peak of carbon and carbon neutrality. Once operational, these projects will not only effectively ease the pressure on local power supply, but also significantly reduce energy consumption and environmental pollution.

The operation of photovoltaic power stations not only reduces the consumption of fossil energy and greenhouse gas emissions, but also promotes the development of environmental protection economy and injects new impetus into the green transformation of local economy. The operation of these power stations has a positive effect on improving the quality of the surrounding environment and protecting the ecological environment, helping to reduce environmental pollution and protect the fragile ecosystem.Editor/Zhang Liyuan

Comment

Related articles

Photovoltaic

New Zealand Energy to build 400MW solar farm

07-19

Photovoltaic

Europe imports 33GW of Chinese PV panels

07-16

Photovoltaic

Liangshan Xichang Youjun Photovoltaic Power Generation Project Starts

07-12

Photovoltaic

Daqing Oilfield's renewable energy power generation exceeds 300 million KWh

07-11

Photovoltaic

Yunnan Songming Fenghuang Mountain 200 MW PV project started

07-11

Photovoltaic

JA Naoer 5GW high-efficiency photovoltaic module project started

07-11

Collect
Comment
Share

Retrieve password

Get verification code
Sure