On September 14, 2024, Inner Mongolia Huadian Group announced the official launch of a major thermal power flexibility transformation and new energy construction project in Chayou Middle Banner, marking a new stage of energy structure transformation in the region. The project has invested a huge amount of 1.2 billion yuan, with a planned total installed capacity of 278000 kilowatts, cleverly integrating 188000 kilowatts of wind power and 90000 kilowatts of photovoltaic power to build a new chapter in green energy.
The project is located in the beautiful Tuchengzi Township and Tieshagai Town, which not only fully utilizes the abundant wind and solar energy resources in the area, but also aims to improve the consumption efficiency of new energy through technological innovation and achieve maximum energy utilization. This move is not only a profound transformation of the traditional energy structure, but also a vivid practice of the concept of sustainable development.
With the gradual progress and final production of the project, Chayou Zhongqi will accelerate towards a green and low-carbon development path, and the new energy industry will usher in unprecedented development opportunities, injecting strong impetus into the local economy. (This article is from the official website of Jian Dao: www.seetao.com. Reproduction without permission is prohibited, otherwise it will be prosecuted. Please indicate Jian Dao Net+original link when reprinting.) Jian Dao Net Strategy Column Editor/Li Na
Comment
Write something~