Recently, Sinopec's Refining and Chemical Engineering Group signed multiple projects in Saudi Arabia and the United Arab Emirates.
Signed the EPC general contract for the Saudi Aramco RTR compressor upgrade project
The project owner is Saudi Aramco, located at the Rastanula Refinery in the Eastern Province of Saudi Arabia. The main scope of work includes the detailed design, procurement, and construction of a new reciprocating compressor system and the renovation of some existing equipment in the plant area. Sinopec Nanjing Engineering Company is responsible for the execution of the project.
Sign the FEED contract for the NGL-5 processing plant project in the United Arab Emirates
The project owner is ADNOC GAS, a subsidiary of Abu Dhabi National Oil Company in the United Arab Emirates. The project is located in Ruwais Industrial City, Abu Dhabi, UAE. The main content of the project is to build a new No. 5 natural gas condensate treatment plant with a processing capacity of 22000 tons/day. SEI and T.EN jointly won the contract for front-end design (FEED) of the project.
Sign the construction contract for the Ruvis LNG project in the United Arab Emirates
The project owner is Abu Dhabi National Oil Company (ADNOC), and the EPC general contractor is a tripartite consortium composed of JGC-T.EN-NPCC. The project is located in the Ruwais Industrial City in Abu Dhabi, United Arab Emirates. The scope of work includes the full professional installation of facilities such as raw gas compression, utilities, flare, refrigeration unit, etc. in the LNG project. Nanjing Engineering Company is responsible for the execution of the project.
This project is also the first collaboration between the company and JGC overseas.
Sign the mechanical and electrical installation construction contract for the P2 package connection facilities of Saudi Aramco Riyas NGL project
The project owner is Saudi Aramco, and the project is located in the Riyas area of the Eastern Province of Saudi Arabia. The main work content is the mechanical and electrical installation of the connecting pipe gallery, torch system, and storage area supporting the 2 × 36000 ton/day NGL processing facility. The Fifth Construction Company is responsible for the implementation of the project.
At the same time, the shipping company won the bid and signed the contract for the lifting and equipment transportation of the P1 package (mixed cracking unit) of the Saudi AMIRAL project.(This article is from the official website of Jian Dao www.seetao.com. Reproduction without permission is prohibited, otherwise it will be prosecuted. Please indicate Jian Dao website+original link when reprinting.) Jian Dao website strategy column editor/Li Xiu'e
Comment
Write something~