Transportation
2.79 billion! Shanxi Shuozhou National Highway Expansion Project Launched
Seetao 2025-06-24 17:34
  • It will significantly improve regional transportation efficiency and promote high-quality economic development along the route
Reading this article requires
6 Minute

The bidding for the renovation and expansion project of the Huairen Wangjiabao to Shanyin Xuegui section of National Highway 208 in Shuozhou, Shanxi Province has officially started. The total investment of the project is 2.79909 trillion yuan. After completion, it will significantly optimize the regional road network structure and inject strong impetus into the economic development along the route.

The project is located in Huairen City and Shanyin County of Shuozhou City, with a north-south direction. The starting point is Wangjiabao Village, Maojiazao Town, Huairen City, and it connects with the endpoint of the Datong Transit Project of National Highway 208. The endpoint is located in Xuegui Village, Shanyin County, and it is seamlessly connected with the existing National Highway 208. Passing through Hejiabao Township, Xinjiayuan Township, Jinshatan Town in Huairen City, and Beizhouzhuang Town in Shanyin County, with a total length of 67.667 kilometers.

The construction scale of the project is huge, with a total of 26 bridges (1759 meters in length), 6 interchanges, 6 separated interchanges, and 1 mainline toll station, 1 maintenance work area, and 2 over limit detection stations built along the entire line. In terms of technical standards, the whole line adopts the standard of two-way four lane first-class highway, with a design speed of 80 kilometers per hour, a subgrade width of 25.5 meters, and a vehicle load level of highway - Class I, strictly complying with the requirements of the Technical Standards for Highway Engineering (JTG B01-2014) to ensure safety and durability.

As a key transportation project in Shuozhou City, this project will effectively alleviate existing road congestion, improve logistics efficiency, and drive resource development, industrial upgrading, and tourism development along the route. At present, the project has completed preliminary preparations and is about to enter the construction phase. The relevant departments promise to strictly control quality and progress, strive to create high-quality projects, and provide solid support for regional coordinated development.(This article is from the official website of Jian Dao www.seetao.com. Reproduction without permission is prohibited, otherwise it will be prosecuted. Please indicate Jian Dao website+original link when reprinting.) Jian Dao website strategy column editor/Yang Beihua

Comment

Related articles

Transportation

AI empowers transportation, World Transport Conference opens in Tianjin

06-05

Transportation

The Suizhou Jingmen Expressway is planned to start construction in December 2026

06-03

Transportation

The traffic in the revolutionary old areas of Gansu has undergone a transformation

06-03

Transportation

China and Kazakhstan will cancel transportation quotas by the end of 2026

05-31

Transportation

The first intercity railway R1 line in Quanzhou is under full construction

05-28

Transportation

The main project of the Pinglu Canal waterway has been fully connected

05-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure