Dry port logistics
The extension project of Haili No. 9 dock track has started
Seetao 2025-09-05 11:55
  • After the renovation, the project will improve throughput and open up a new chapter of cooperation.
Reading this article requires
5 Minute

Recently, in the Yangtze River Economic Development Zone of Zhangjiagang City, the Zhangjiagang Haili No. 9 Wharf Rail Extension Project, which was constructed by the Third Company of China Communications Third Navigation Bureau, officially broke ground. Colorful flags fluttered and machinery roared on site, creating a busy and orderly scene.

Haili Pier 9 is like a brilliant pearl, embedded in the golden waterway of Zhangjiagang City's Yangtze River Economic Development Zone. The dock platform has a grand scale, with a length of 640 meters and a width of 28 meters. The renovation is of great significance, and after completion, it will form a bulk cargo berth capable of carrying 70000 tons. This change will greatly enhance the cargo throughput capacity of the port, inject new vitality into the busy operation of the port, better meet the growing demand for port operations, and help Zhangjiagang Port stand out in fierce port competition.

It is worth mentioning that the concept of environmental protection runs through the entire process of project promotion. CCCC Third Harbor Engineering Co., Ltd. is well aware of the importance of ecological environment protection and will strictly implement various environmental protection policies. From the design of construction plans to the operation of specific construction processes, the impact on the surrounding environment will be fully considered. By adopting advanced environmental protection technologies and equipment, strengthening environmental management at construction sites, and striving to achieve port development while minimizing damage to the ecological environment, we strive to achieve a balance and unity between port development and ecological protection, and create a green and sustainable port project.

The launch of the Zhangjiagang Haili No. 9 Terminal Rail Extension Project is another close cooperation between CCCC Third Harbor Engineering Co., Ltd. and Shagang Group in the fields of port construction and industrial upgrading. This not only marks a new chapter in cooperation between the two sides, but also lays a solid foundation for future cooperation in more fields and deeper levels. It is expected to work together to create more brilliance and contribute strong strength to local economic development and industrial upgrading. Editor/Cheng Liting

Comment

Related articles

Dry port logistics

Shandong ports lead the high-quality development of global ports

12-05

Dry port logistics

From a billion ton port to an efficient port, Qingdao Port's dual terminal leap path

12-05

Dry port logistics

Ruijin International Land Port Railway Dedicated Line Approved

11-19

Dry port logistics

China helps Latin America reshape supply chain patterns such as Qian Kai Port

11-13

Dry port logistics

Zhengzhou Xinzheng Comprehensive Bonded Zone expands to establish a land port area

11-12

Dry port logistics

Hengshui International Land Port Logistics Zone Warehouse Project Commences Construction

09-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure