Wind power
Xidian Xirong's "ace" reactor successfully won the bid for two wind farms in Romania
Seetao 2026-03-27 15:54
  • In the fiercely competitive European new energy market, China's high-end power equipment has once again won a key position
Reading this article requires
3 Minute

Recently, Xidian Xirong Company, a subsidiary of Xidian Group, successfully won orders for reactor equipment for two wind farms in Romania, marking the deep integration of Chinese made core electrical equipment into the main context of European green energy construction.

When the wind in the lower Danube plain of Romania is about to drive wind turbines to convert into clean electricity, a set of "stabilizers" from China is also ready in place. Recently, under the coordination of the International Marketing Center of the group, Xidian Xirong successfully won the bid for the 250 MW Ialomita and 252 MW Gurbanesti wind farm projects in Romania, providing a total of 21 35 kV dry-type hollow parallel reactors. These two major projects are key power engineering projects in the European region, which have attracted much attention since the global bidding began in December 2025. In the face of international competition, Xidian Xirong deeply implements the marketing strategy of "first level leadership, second level support" of China Xidian Group, efficiently integrates technical solutions, business docking, and resource scheduling, and ultimately stands out with reliable product performance and optimized solutions, winning this significant European order.Editor/Yang Meiling

Comment

Related articles

Wind power

Xinjiang Hefeng 500000 kW wind power full capacity grid connection

03-24

Wind power

Bid opening for centralized procurement of nearly 4GW wind turbines by Huaneng

03-24

Wind power

Two major deep-sea offshore wind power projects in Guangdong have won bids

03-23

Wind power

3480MW! Zhejiang, China announces first batch of major offshore wind power projects

03-22

Wind power

Yangjiang offshore wind power rushes to be connected to the grid within the year

03-22

Wind power

35GW centralized procurement plan

03-20

Collect
Comment
Share

Retrieve password

Get verification code
Sure