News
Over 30 million kilowatts of pumped storage projects will be built
Seetao 2026-04-10 09:50
  • Building a green ballast stone for a new power system with a grand scale of 120 million kilowatts
Reading this article requires
3 Minute

During the 15th Five Year Plan period, State Grid Corporation of China will accelerate the construction of pumped storage power stations and plan to start new pumped storage installations with a capacity exceeding 30 million kilowatts.

By 2030, the installed capacity of pumped storage in operation and under construction by State Grid will exceed 120 million kilowatts, providing over 150 million kilowatts of power regulation capacity, a surge of more than 70% compared to the end of the 14th Five Year Plan period. This astonishing increase is equivalent to rebuilding the regulating capacity of several Three Gorges power stations, which will completely solve the stubborn problem of "relying on the weather to eat" in new energy and install super stabilizers for the efficient consumption of wind and solar power.

This is not just talk on paper. From the Gobi Desert in Hami, Xinjiang to the towering mountains in Mengyin, Shandong, from the forests and snowy plains in Antu, Jilin to the deep mountain canyons in Luoning, Henan, giant energy batteries are rising from the ground one by one. In just 2026, State Grid Corporation of China will invest a whopping 31 billion yuan in real money to ensure that key projects such as Mengyin Duozhuang are approved and start construction immediately, demonstrating the country's speed through practical actions.Editor/Cheng Liting

Comment

Related articles

News

New the Belt and Road Initiative in Aralcha, Kyrgyzstan

04-09

News

The advantages of China's offshore wind power industry continue to strengthen

04-09

News

Long March 8 successfully launches Qianfan constellation satellite

04-09

News

Upgrading urban and rural charging networks to ensure smooth travel

04-08

News

Double wheel drive of energy and future industries during the 15th Five Year Plan period

04-08

News

The deepest offshore wind power project in China is connected to the grid

04-07

Collect
Comment
Share

Retrieve password

Get verification code
Sure