Chemicals
Construction of Zhundong 2 billion cubic meters Coal-to-Gas Project Enters Crucial Phase
Seetao 2026-09-02 16:33
  • After completion, it will produce 2 billion cubic meters of coal to natural gas annually
  • This project is of great significance in ensuring national energy security and promoting clean and efficient utilization of coal
Reading this article requires
9 Minute

On August 31, 2026, a construction site in Zhundong Economic and Technological Development Zone, Xinjiang, was bustling with machinery and vehicles. Song Shijie, Secretary of the Party Committee and Chairman of Xinjiang Xinye Group, and his delegation visited the site of the 2 billion cubic meters/year coal to natural gas project in Zhundong to inspect the overall progress of the project. As he walked, he inquired in detail about the construction organization and design progress, with fine beads of sweat on his forehead, and his gaze fixed on this land that carries the energy strategy mission.

As the Tianzi No.1 project of Xinye Group, the Zhundong Coal to Gas Project is located in the National Coal to Oil and Gas Strategic Base and has now entered the construction phase of comprehensive efforts. At the subsequent on-site promotion meeting, Song Shijie listened to the report from the project command center on peripheral support, equipment procurement, and safety control, and deployed key tasks such as construction progress, engineering quality, and construction safety. He emphasized that all participating units and project teams must anchor their goals, solidify their responsibilities, seize the golden period of construction, push forward the nodes and work, and make every effort to ensure that the project is completed on schedule and put into operation smoothly.

Scientific coordination ensures progress

At the project promotion meeting, construction organization became the first focus of attention. Song Shijie requested the detailed preparation of a three-level construction schedule, which corresponds nodes, personnel, and material support one by one, ensuring efficient connection between each process, and achieving the goal of letting people wait for work rather than waiting for others. Currently, the project site is implementing scientific coordination to refine the construction plan to the day and assign responsibilities to individuals, providing a solid guarantee for seizing the golden construction period.

Source control improves quality

Design is the source of engineering construction. Song Shijie emphasized the need to accelerate the detailed design progress, strengthen the allocation of design personnel and drawing review, and prioritize ensuring the on-site construction design requirements. At the same time, it is necessary to actively learn from production and operation experience to optimize design plans and reduce potential operational risks from the source in the later stages. In addition, he also proposed to actively introduce new technologies and methods, improve automation and intelligence levels, and promote project quality and efficiency through intelligent construction.

Safety bottom line and operational preparation

Safety and quality are the lifeline of project construction. Song Shijie requested the full implementation of the on-site requirements for the project department and construction personnel, the consolidation of on-site supervision responsibilities, the establishment of a sound quality management system, and the assurance of synchronous control of construction quality and safety. At the same time, the project has started to plan ahead for the transition from the construction period to the production and operation period, and has done a good job in personnel reserve and pre job training to ensure that it is completed and put into operation efficiently.

During the research period, Song Shijie also listened to work reports on the progress of new projects. Ni Changjun, Deputy Chief Engineer of the Group Company, members of the home leadership team and executives of Wojiang Clean Energy Company, as well as the main leaders of the coal to gas project of Saiding Engineering Co., Ltd., accompanied the research.Editor/Yang Meiling

Comment

Related articles

Chemicals

The Ambassador to Iraq meets with the Minister of Oil and Electricity of Iraq in Bobai

09-01

Chemicals

CCCC Overcomes Offshore Challenges to Achieve SBM Breakthrough in Oman

08-31

Chemicals

China-Russia LNG Trade Restructures National Energy Import Landscape

08-31

Chemicals

CNCEC Expands North African Industrial Chain via Egypt Phosphate Project

08-31

Chemicals

Pingmei Shenma Industry Layout Further Expansion

08-31

Chemicals

Total Exits Russian Arctic LNG2 Project, Platform Secures Brazil Order

08-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure