Transportation
Multiple rail projects speed up, Chongqing transportation upgrades again
Seetao 2026-10-30 11:14
  • Multiple lines are advancing synchronously, ensuring smooth and orderly construction
Reading this article requires
5 Minute

As the rail tunnel extends deeper into the mountains and the steel rails connect transportation hubs, the Chongqing rail transit network is continuously expanding outward. A batch of suburban railway and subway projects are steadily advancing to seize construction nodes, constantly narrowing the distance between urban clusters and weaving a more convenient transportation network for citizens' travel.

Steady progress in investment in the first three quarters

In the first three quarters of 2026, Chongqing will accelerate the construction of key public transportation projects led by rail transit, with a cumulative investment of over 14.1 billion yuan. Chongqing Transportation Investment Group has completed a batch of municipal key projects with an investment of 14.18 billion yuan, achieving 77.5% of the annual plan and ahead of schedule. We will continue to make efforts and strive for the annual investment target of 18.31 billion yuan.

The orderly implementation of the dual line assault construction

The control project for the Shapingba section of the suburban railway from the central urban area to Yongchuan Line has recently started construction. The excavation of the Zhongliangshan Tunnel and various construction channels is steadily advancing, with a total length of 70 kilometers, 17 stations, a maximum speed of 140 kilometers per hour, and connecting multiple important hubs. The Bishan to Shiqiaopu section of Metro Line 27 has started joint debugging and testing, and has completed hot sliding. The signal system is currently being debugged, with a total length of 56 kilometers and 15 stations. Keywords: Chongqing, transportation, rail transit

Hub connected travel time upgrade

After the completion of the Yongchuan Line, it will connect hubs such as Bishan Airport and Chongqing West Station; Line 27 connects Chongqing East Station, Chongqing Station, and Shapingba Station, and can be reached within one hour from Bishan to Chongqing East Station. In the future, we will accelerate the construction of projects such as the first phase of Line 17 and the northern extension of Line 18, and continue to improve the rail transit network.Editor/Gong Ziwei

Comment

Related articles

Transportation

Budapest launches tender for 3.5-kilometer light rail in the north

11-16

Transportation

8.5B Yuan Coal Power EPC Locks Qinghai Green Power Supply to Guangdong

11-15

Transportation

The Belt and Road --- CRRC Dalian Diesel EMU to West Africa, delivered to Lagos Red Line

11-15

Transportation

The shield tunneling on the Zhoushan side of the Jintang Subsea Tunnel has been completed

11-13

Transportation

Xinjiang's Gongnaisi Bridge: Builders Drill Pile Foundations into Frozen Tianshan Ground

11-11

Transportation

General Agreement on Cross border Railways among the Six Gulf Countries Signed

11-09

Collect
Comment
Share

Retrieve password

Get verification code
Sure