Transportation
Changsha Metro Line 2 West Extension Phase II Work Report Approved
Seetao 2021-01-08 11:49
  • The total length is 13.99 kilometers, there are 11 stations on the whole line, and the maximum operating speed is 80 kilometers/hour
Reading this article requires
4 Minute

Recently, the Hunan Provincial Development and Reform Commission officially approved the construction of the second phase of the west extension project of Changsha Rail Transit Line 2.

Changsha Rail Transit Line 2 West Extension Phase II Project

The second phase of the west extension of Changsha Rail Transit Line 2 starts at Changsha West Station, and leads south along Huizhi Road to the core area of Meixi Lake, then along the central axis of Meixi Lake to the east, and ends at the first phase of west extension of Line 2 The starting point of the project is Meixi Lake West Station (not included). The line is 13.99 kilometers long, of which the underground line is 13.78 kilometers long and the surface line is 0.21 kilometers long. There are 11 stations, all of which are underground stations, including 3 transfer stations. The engineering vehicles adopt B-type vehicles with a maximum operating speed of 80 km/h, and 6 vehicles are used in the initial, short-term and long-term formation. The estimated total investment is 12.342 billion yuan and the construction period is 52 months.

In the future, with the construction of the second phase of the west extension project of Changsha Metro Line 2, it will further promote the construction of a new type of people-centric urbanization and modern metropolitan area, and further turn Changsha West Railway Station into an important comprehensive transportation hub in Hunan Province. Editor/He Yuting

Comment

Related articles

Transportation

Chinese Enterprises Compete for Moroccan Railway Freight Car Procurement Bidding

10-26

Transportation

GMG Wins Major Maintenance Contract for ECRL in Kuala Lumpur

10-25

Transportation

The welding of the long track of the Mo Sheng high-speed railway has been completed

10-25

Transportation

Chongqing-Kunming High-speed Rail Finishes Track Laying on Yibin-Kunming South Section

10-25

Transportation

Baku Metro Welcomes Financing Upgrade, Chinese Enterprises Gain Cooperation Opportunities

10-24

Transportation

Erlianhaote Zhongyuan Land Port Railway Dedicated Line officially starts construction

10-23

Collect
Comment
Share

Retrieve password

Get verification code
Sure