Central enterprises
7.8 billion! Bid issued for Nanchang City Ring Expressway
Seetao 2021-11-26 15:37
  • After completion, it will be beneficial to the formation of Nanchang's main traffic network and optimize the urban spatial structure
Reading this article requires
6 Minute

On November 25, 2021, Jiangxi Public Resources Exchange announced that the bid for the design, procurement and construction of the new project of the West Second Ring Road (Houtian to Lehua Section) of Nanchang City Ring Expressway was announced. China Railway 18th Bureau, China Construction Third Bureau, China Railway Daqiao Bureau and China Railway are on the list in one game!

Project Overview

The new construction project of the West Second Ring Road (Houtian to Lehua Section) of Nanchang City Ring Expressway starts at the Houtian hub of the Shanghai-Kunming Expressway and connects with the Shanghai-Kunming Expressway. Gang Town, Xishan Town, Shibi Town of Qiaole Township in Anyi County, Dinghu Town of Changbu Town, Dongyang Town, Wanbu Town, Luoting Town of Wanli District of Changjun Township, Xixia Town of Xinjian District, Lehua Town , Finally Nanchang North Hub, along with the East Outer Ring, and Changjiu Expressway forming a'Ten'-shaped cross hub. A total of 13 interoperable seats are set up across the line. Among them are 4 hub interchanges (respectively Houtian hub, Xishan hub, Shibi hub, Nanchang North hub), 9 interchanges (respectively Liuhu, Shigang, Xishanbei, Qiaole, Anyi Ancient Village, Anyi East, Changjun, Luoting and Xixia are interlinked). Set up 1 service area (service area for Anyi Ancient Village). The total length of the route is 86.81 kilometers. The total project estimate is 14.796 billion yuan, and the estimated construction and installation costs are 991.1 million yuan. The main line adopts two-way six-lane highway standard construction; the design speed is 100 km/h, and the subgrade width is 33.5 meters; the vehicle load class adopts highway-I; the design flood frequency: 1/300 for super bridges, 1 for other bridges, culverts and subgrades /100; Navigation level: Luhe VII-2; Beiluhe VII-2; peak ground acceleration is 0.05g; other technical indicators shall be implemented in accordance with current relevant standards and specifications.

Winning bid result

After the evaluation of the bid evaluation committee, the candidates who won the bid for the design, procurement and construction of the new project of the West Second Ring Road (Houtian to Lehua Section) of Nanchang City Ring Expressway are announced as follows:

www.seetao.com China Railway Eighteenth Bureau Group Co., Ltd., China Construction Third Bureau Group Co., Ltd., China Railway Bridge Bureau Group Co., Ltd., and China Railway First Bureau Group Co., Ltd. are pleased to place orders! Editor/Sang Xiaomei

Comment

Related articles

Central enterprises

CSCEC intends to participate in the construction of Ashgabat in Turkmenistan

05-25

Central enterprises

CNOOC enters the deep-sea mining industry

05-22

Central enterprises

CRRC alkaline electrolysis cell successfully delivered!

05-22

Central enterprises

Datang Power invests 10 billion yuan to establish a joint venture energy storage company

05-22

Central enterprises

State Grid holds talks with China Energy Engineering Corporation

05-22

Central enterprises

The world's largest single floating wind turbine empirical project has been launched

05-21

Collect
Comment
Share

Retrieve password

Get verification code
Sure