Among all infrastructure constructions, transportation construction can be regarded as the vanguard. On March 28, 2023, a reporter from Jiandao.com learned from the Shanxi Provincial Development and Reform Commission that recently, five special railway lines in Shanxi Province have been approved, which are located in Yuanping City, Jiexiu City, Qinshui County and Gaoping City.
The first special line is located in Daniudian Town, Yuanping City. Yuanping Tianbang Industry and Trade Co., Ltd. has a dedicated railway line with a total length of 1.668 kilometers and an estimated total investment of 351.62 million yuan.

Project construction scale and standards: The main line of the dedicated line is 1.668 kilometers long, connecting from the Taiyuan throat of Daniudian Station of Beitongpu Railway. The throat is adaptively transformed and a pull-out line is added with an effective length of 850 meters. After the junction and fork, the existing high platform will be bypassed by a curve with a radius of 300 meters to the west, and a loading station will be set up parallel to the North Tongpu Railway to the north. There are 2 delivery and cargo lines at the loading station, with an effective length of 1,050 meters; 1 machine routing line and 1 machine standby line, with effective lengths of 968 and 115 meters respectively.
The second one is located in Zhanglan Town, Jiexiu City. The Zhanglan Railway Special Line of Jiexiu Ruihuida Energy Co., Ltd. connects from the west side of the Taiyuan throat of Zhanglan Station. The estimated total investment of the project is 728.9784 million yuan.
Project construction scale and technical standards: Jiexiu Ruihuida Energy Co., Ltd. Zhanglan Railway Special Line connects from the west side of the Taiyuan throat of Zhanglan Station, and sets a safety line at the junction, and then goes north to the west side of the South Tongpuzheng Line The loading station is arranged, and the total length of the line is 1.739 kilometers.

Articles 3 and 4 are located in Qinshui County. The total length of the main line of Shanxi Coal East Dazhengzhuang Special Railway and China Coal Huajin Group Jincheng Energy Co., Ltd. Libi Coal Mine Railway Dedicated Line is 20.874 kilometers, and the effective length of China Coal Libi Coal Mine Railway Dedicated Line is 1080 meters. The estimated total investment of the project is 3,928.1102 million yuan.
Project construction scale: The main line of Jinmei East Dazhengzhuang Railway and China Coal Huajin Group Jincheng Energy Co., Ltd. Libi Coal Mine Railway has a total length of 20.874 kilometers. The special line is 7.715 kilometers. The reconstruction of the connecting station (Zhengzhuang Station) and the parallel section of the two railways (from the section to the 200-meter end of the Zhengzhuang Bridge with a long mileage) are jointly constructed by both parties.
Article 5 is located in Gaoping City. The newly built Nanyang special railway is 8.583 kilometers, the Dongfeng special railway is 7.933 kilometers, and the ditch bottom special railway is 6.052 kilometers. The estimated total investment of the project is 3,997,930,800 yuan. Editor/Xu Shengpeng
Comment
Write something~