Transportation
Mumbai launches $620 million transportation upgrade plan
Seetao 2025-11-06 14:58
  • This project will improve regional traffic efficiency and support sustainable urban development
Reading this article requires
5 Minute

The Mumbai Metropolitan Development Authority (MMRDA) recently announced a comprehensive transportation infrastructure upgrade plan with a total investment of over 620 million US dollars, focusing on the rapidly growing Tana region. The plan includes two key road projects: a $210 million, two-way six lane elevated highway that will connect the Anandnagar Saket road; Another $60 million Goldbend Road widening project will expand the section into a two-way seven lane road, constructed entirely with concrete structures.

These projects are an important component of MMRDA's systematic solution for the Tana region. In addition to road expansion, the plan also includes upgrading the local road network and installing intelligent traffic control systems, aiming to optimize traffic flow through technological means and alleviate the long-standing congestion problem in the area.

Tana region, as one of Mumbai's most important satellite cities, is facing traffic pressure brought about by rapid development. According to statistics, the population of the region has grown by over 40% in the past decade, and the number of motor vehicles has also surged. The existing road network is no longer able to meet travel needs. This infrastructure upgrade will not only improve the efficiency of residents' transportation, but also strengthen the economic connection between Tana and Menggai urban areas.

Experts point out that this investment reflects the strategic thinking of the Indian government in response to rapid urbanization. With the continuous expansion of the Mumbai metropolitan area, improving satellite city infrastructure to alleviate the pressure on the core city has become an important path to promote regional coordinated development. The implementation effect of this project will provide important reference for traffic management in other metropolitan areas of India. Keywords: International News and Information, International News Network

It is reported that MMRDA has set a clear timetable for the entire plan, and it is expected that these projects will be completed in stages within the next three years. At that time, the Tana region will form a more efficient road network system, providing a better transportation environment for local residents and commercial activities.Editor/Cheng Liting

Comment

Related articles

Transportation

Three bid sections of Xizang Bomi Ranwu Railway have been completed

12-13

Transportation

Hungary advances Budapest Airport railway project

12-13

Transportation

Germany adds 3 billion euros to launch road construction and bridge repair plan

12-13

Transportation

Colombia's Antioquia Province restarts riverside train project

12-12

Transportation

Ireland's railway electrification accelerates

12-12

Transportation

Chinese infrastructure shortlisted for Morocco high-speed railway station construction

12-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure