With the continuous increase in urban passenger flow, Panama's rail transit has entered a comprehensive upgrade stage. The local subway company has finalized a new annual budget, simultaneously promoting the procurement of new cars and the preparation of new line bidding, and comprehensively improving the urban transportation network.
The Panama Metro Company has released its 2027 budget plan, with a total budget of 873.8 million US dollars, covering project investment and daily operations. This plan includes two core measures: purchasing 7 new trains to strengthen the existing line capacity, and initiating the bidding preparation work for the extension project of Metro Line 2. Keywords: Panama Metro, Rail Transit Upgrade
The extension line of Line 2 will adjust its endpoint, increasing its total length to 9.2 kilometers. A comparison will be made between the elevated and underground laying schemes, and a transfer passage will be built with Line 1. The new line will use the existing line technology standards to ensure operational adaptability and maintenance efficiency. At the same time, the local subway will update its old escalators and upgrade its ticketing system to meet the annual passenger demand of 132.4 million people.Editor/Min Jing
Comment
Write something~