The data center electromechanical engineering, which took several years to complete, can now be implemented in just six months. Times Flying believes that the key to the success or failure of a project is already completed before the start of construction. The development of AI has driven a surge in global computing power demand and a surge in demand for data center construction. But there is a huge gap between computing power demand and infrastructure delivery capability: chip delivery only takes a few months, while traditional data center construction often takes several years.

The data center belongs to a heavy asset project, and the construction process is cumbersome. The bottleneck is not in civil engineering, but in the long procurement cycle of mechanical and electrical equipment, the difficulty of multi-disciplinary collaboration, and the difficulty of keeping up with GPU iteration speed in computer room design. Delay in project schedule will directly cause economic losses, and the delivery speed of data centers has become an important business indicator.
Achieve rapid delivery within six months
Era Flying has compressed the delivery cycle of data center electromechanical engineering to six months, provided that the civil engineering and power grid conditions are in place and there are no major design changes. The company has delivered a total of 4GW of electromechanical projects, including 1.5GW of liquid cooled machine rooms, and is also promoting overseas projects in Malaysia and Thailand. In response to the differences in regulations among countries, a standardized+localized adaptation model is adopted to achieve rapid delivery capabilities for cross-border replication.

Pre standard strict control of construction period
A large amount of core work is completed before the construction site enters. Enterprises reserve two sets of standardized drawings for conventional and liquid cooling, and rely on BIM modeling to identify design conflicts in advance, which can shorten the deepening design cycle by more than 30% and reduce rework. After the design is completed, multiple tasks will be carried out in parallel to lock in equipment production capacity in advance and reserve alternative suppliers. The project coordinates all professional mechanical and electrical construction, standardizes the power transmission process, and achieves 100% successful one-time power transmission for all projects.

Full cycle guarantee for long-term operation and maintenance
This delivery system is based on 24 years of industry accumulation. The leakage and other hidden dangers in the liquid cooling room have a strong lag, and long-term operation tests the ability to control the entire process. Enterprise persistence: Short term construction quality determines the operational effectiveness of data centers in the next 15 to 20 years. Era Flying provides full lifecycle services from design, construction to operation and maintenance. The operation and maintenance threshold of liquid cooling equipment room is higher, requiring professional abilities such as fluid chemistry and leakage monitoring. In the era of computing power, faster delivery data centers can help operators monetize computing power and seize the market ahead of others.Editor/Gong Ziwei