On October 12, the “Second Announcement of the Environmental Impact Assessment of the New Beijing-Xiong’an New Area-Shangqiu High-speed Railway from the Xiong’an New Area to Shangqiu Section” was officially released on the websites of the people’s governments of the cities (districts) along the route. The layout plan has been released. It is reported that the project has a total construction period of 4 years and is scheduled to start in January 2021 and be completed in December 2024.

Project Overview
The line is located between the Beijing-Shanghai high-speed railway and the Beijing-Guangzhou passenger dedicated line. It basically follows the existing Beijing-Kowloon Passage, starting from Xiong'an Station in the north, and passing through Xiong'an New District, Cangzhou City, Hengshui City, Xingtai City and Shandong Province to the south. The city, after crossing the Yellow River in Taiqian County, Puyang City, Henan Province, passes through Jining City, Heze City, Shandong Province, and Shangqiu City, Henan Province to Shangqiu Station on the Shanghe-Hangzhou Railway.
The length of the main line of the newly-built Beijing-Xiong’an New Area-Shangqiu high-speed railway from the Xiong’an New Area to Shangqiu section is 552.547km, of which the length of the main line of the project scope is 545.695km (excluding the off-line at both ends of Xiong’an Station and Xiong’an Station in Jingxiong Shopping Mall) Simultaneous implementation project 4.552km, Shanghehang project and offline simultaneous implementation project 2.3km). It also includes 33.541km of related projects in Xiong'an, Hengshui, Liaocheng, Heze, and Shangqiu.
It passes through 3 provinces, 9 cities and 25 counties (districts), including 257.287km in Hebei Province, 268.826km in Shandong Province, and 23.581km in Henan Province.
This project is a passenger dedicated line, dual-line, electric traction, with a total project investment of 81.08 billion yuan and a target design speed of 350km/h. The total length of the main line bridge double line is 516.288km, accounting for 94.61% of the total line length.
Station setting
This line consists of Xiong'an, Renqiu West, Suning East, Shenzhou East, Hengshui South, Zaoqiang South, Qinghe West, Linqing East, Liaocheng West, Taiqian East, Liangshan, Yuncheng, Heze East, and Caoxian West 15 stations at Shangqiu Station.
Among them: Xiong'an Station is the Beijing-Xiong Intercity Railway Project, Shangqiu Station is the Shanghe-Hangzhou Railway Project, not included in this project; Liaocheng West Station and Zhengji Railway Station together, Heze East Station and Lunan High-speed Railway Station together; Yuncheng Station , Liangshan Station, Shangqiu Station and the existing Beijing-Kowloon Railway. Set up an EMU storage yard at Hengshui North Station, implement a reserved project at the Xiongan EMU, and build a new maintenance work area at the Shangqiu EMU storage yard.

The new Beijing-Xiong’an New Area-Shangqiu high-speed railway is an important part of the Beijing-Hong Kong-Taiwan corridor. It is a backbone line in the high-speed passenger transport network and a grid-type high-speed passenger transport network that runs through the central and eastern regions of China. The main skeleton. After the completion and opening to traffic, it will support and lead the coordinated development of the Belt and Road, the Beijing-Tianjin-Hebei and the Yangtze River Economic Belt, and promote the further improvement of important infrastructure in the areas along the route. Editor/He Yuting
Comment
Write something~