Central enterprises
Bidding of Shenzhen Urban Rail Transit Line 12 Phase II Project Opened
Seetao 2021-01-19 15:09
  • This subway project has a total length of 8.05km and a total of 6 stations
Reading this article requires
6 Minute

Recently, China Power Construction Corporation’s indirect wholly-owned subsidiary China Power Construction Southern Construction Investment Co., Ltd. and its holding subsidiaries, China Water Resources and Hydropower Seventh Engineering Bureau Co., Ltd., China Water Resources and Hydropower Eighth Engineering Bureau Co., Ltd., and China Water Resources and Hydropower No. The Eleven Engineering Bureau Co., Ltd. formed a consortium and won the bid for the second-phase construction general contracting project of Shenzhen Urban Rail Transit Line 12 (hereinafter referred to as the "project"), with a bid amount of approximately RMB 6.184 billion. The total length of the project line is about 8.05km, and it is laid underground.

Project details

Shenzhen City Rail Transit Line 12 has a total length of about 40.560km. It is the fourth phase of the rail transit network construction plan, which passes through Shenzhen Nanshan Central District, Baoan Central District, Fuyong Area, Big Airport and Exhibition Area from south to north. Rail transit backbone line; it is a backbone transportation line that supports the development of the development axis in the western part of Shenzhen and improves the quality of urban development in the Qianhai (Shekou) Free Trade Zone and the Airport New City area. It is essential to alleviate traffic congestion in the Nanshan Central District and Baoan Central District .

The second phase of the project has a total of 6 stations, including 1 transfer station. The average distance between stations is about 1.34km, the maximum distance between stations is 2.15km (from Haitianyuan East Station to Haoxiang Station), and the minimum distance between stations is 1.08km (from Xihuan Road Station to Shasan Station); an additional Dongbao River parking lot; other line prefabricated station projects include two prefabricated stations, including Huaxia Station on the second phase of line 6 branch line and the second phase of city traditional Chinese medicine station on line 13. The project duration is 1,704 calendar days.

After the completion of the second phase of Shenzhen Metro Line 12, it will become the backbone of rail transit in the exhibition area, Shajing, Songgang and Guangming districts, supporting the urban development of the Airport New Town area, Shajing and Songgang areas, alleviating traffic congestion in the area, and improving the tracks in the peripheral areas. Efficient routes covered by traffic. Editor/Peng Xue

Comment

Related articles

Central enterprises

hundong Coal to Natural Gas Project EPC General Contracting Contract Signing

05-28

Central enterprises

CSCEC intends to participate in the construction of Ashgabat in Turkmenistan

05-25

Central enterprises

CNOOC enters the deep-sea mining industry

05-22

Central enterprises

CRRC alkaline electrolysis cell successfully delivered!

05-22

Central enterprises

Datang Power invests 10 billion yuan to establish a joint venture energy storage company

05-22

Central enterprises

State Grid holds talks with China Energy Engineering Corporation

05-22

Collect
Comment
Share

Retrieve password

Get verification code
Sure