Transportation
Guangzhou-Qingyuan Intercity Rail Transit Project starts bidding!
Seetao 2020-06-04 14:40
  • It is the main line for Guangdong Province to implement and transform the mode of economic development
Reading this article requires
8 Minute

June 1, 2020, learned from Guangdong Public Resources Trading Network,The specific project name for this bidding is the bidding for the total construction cost of the project in front of the station from the Qingyuan Station (excluding) to the Provincial Vocational Education City Station (inclusive) of the Guangzhou-Qingyuan Intercity Rail Transit

Project Overview: Pearl River Delta Intercity Rail Transit Guangqing Intercity Qingyuan Station to Provincial Vocational Education City Station, located in Qingyuan City, Guangdong Province, is a part of Guangqing Intercity.

 The line is led from the north end of the Guangqing Intercity Qingyuan Station under construction, along Qingyuan Avenue, parallel to the Wuhan-Guangzhou High-speed Railway, along the Vocational Education First Road, and to the Provincial Vocational Education City Station on the west side of Huancheng East Road. The total length of the line is 19.882km, and there are 4 stations, namely Yanhu New City, Qingyuan East, Feixia Mountain and Provincial Vocational Education City, of which Feixia Mountain Station is a reserved station. 

A parking yard is reserved on the northwest side of the Provincial Vocational Education City Station. The estimated total investment of the project is about 6.16 billion yuan (excluding reserved parking yard), and the project construction period is tentatively set at 4 years. Planned construction period: The total construction period is 48 months.

Scope of bidding for this project: Guangqing Intercity Qingyuan Station (excluding) to Provincial Vocational Education City Station (inclusive) section in front of the station (DK67+610~DK87+498), including the reconstruction and expansion project that caused the construction of Guangqing Intercity The specific contents include: Chapter 1 Demolition and Land Acquisition Costs (including road relocation, traffic dredging and related projects required to be implemented simultaneously due to local government requirements, river and ditches relocation, "three power" relocation (including cooperation with property rights units to implement 10kV Relevant projects and work related to the relocation of power line facilities above, and relocation of power line facilities below 10kV.

Relocation and protection of all communication lines and facilities), relocation of fuel oil (gas) and water supply and drainage pipelines, electromagnetic interference prevention of fuel (gas) pipelines, temporary land use and reclamation, etc.); Chapter 2 Subgrade; Chapter 3 Bridges; Chapter 4 Tunnels; Chapter 5 Tracks; Chapter 6 Integrated Grounding System; Chapter 8 Houses (including elevated stations and corridors, underground stations and other structural projects (including reserved pre-buried), excluding building decoration and installation projects ); Chapter 9 level aisles, flyover structures, rain canopy foundations, sound barriers, etc.; Chapter 10 large-scale temporary facilities and transition projects; Chapter 11 other costs (business line construction coordination fees, safety production fees, karst treatment fees Etc.); Chapter 12 Basic Preparation Fees (General Contracting Risk Fees).

Anyone who intends to participate in the bidding is requested to open from 9:30 am to 12:00 am and 14:00 pm to 16:00 pm (Beijing time, next day) Same), register and purchase bidding documents at Guangzhou Public Resources Trading Center (first floor, No.333 Tianrun Road, Tianhe District, Guangzhou).

Deadline for submission of bid documents: 09:00 on June 24, 2020 Place of submission of bid documents: Tender Opening Room 06, Guangzhou Public Resources Trading Center, 333 Tianrun Road, Tianhe District, Guangzhou Editor/Chai Yue

Comment

Related articles

Transportation

Over 2 billion US dollars! COSCO Shipping plans to build 12 LNG dual fuel container ships

04-03

Transportation

Wuhan Hub Direct Line officially starts construction

04-03

Transportation

Wuhan Hub Direct Line Cross River Bridge Construction Starts

04-02

Transportation

North and South Xinjiang enter the era of 8-hour direct travel

04-01

Transportation

18.5 billion yuan! China Communications Construction wins bid for a major project

04-01

Transportation

Xianning International Land Port breaks through again

03-31

Collect
Comment
Share

Retrieve password

Get verification code
Sure