On September 1, 2026, CANGYU SPACE and CETC No.39 Research Institute (NWIEE) organized a coordination meeting in Xi'an for the testing, start-up, and installation of the CY-G1 operation control system. CETC No.54 Research Institute (NWIEE)、Huanyu Satellite、Zhongke Bizhi、Zhonglian Zhitong Waiting for participating research units to attend.

The meeting arranged and deployed the testing work for each subsystem of the CANGYU satellite operation and control system, coordinated and coordinated the deployment plan for equipment entry and installation of each subsystem, clarified the entry timing, implementation connection and coordination requirements, and made unified arrangements for subsequent work, laying the foundation for the smooth promotion of system construction.
The next day, CANGYU SPACE and CETC No.39 Research Institute (NWIEE) organized relevant research units to go to Meixian to carry out environmental surveys of tower foundations and computer rooms. Based on the installation requirements of the research equipment, each unit confirmed the equipment layout, wiring layout, and supporting conditions on site, and coordinated and implemented relevant issues to make sufficient preparations for the next stage of equipment deployment and system installation.
The convening of this meeting marks the comprehensive launch of the CY-G1 operation control system testing work. In the future, CANGYU SPACE will closely collaborate with various research units, continuously tackle challenges, steadily advance the system wide integration and on-site acceptance work, and resolutely form practical measurement and operation control capabilities on schedule, providing safe and reliable measurement and operation support for CY-G1.Editor/Min Jing
Comment
Write something~