Transportation
Alstom Secures €800M Gautrain Modernisation Contract in South Africa
Seetao 2026-10-20 16:02
  • Upgrading and speeding up African rail transit, consolidating the foundation of regional commuting transportation
Reading this article requires
4 Minute

The benchmark commuter railway in Gauteng Province, South Africa, the Gauteng train, is about to undergo a systematic renovation. Alstom, as a strategic industrial partner of the SSM consortium, has won a 15 year renovation contract worth 800 million euros. The project will add new trains, upgrade signal systems, and synchronously renovate the fleet, continuously safeguarding the core commuting routes in Africa.

The project covers the construction of new buildings

The Gauteng train route is approximately 80 kilometers long, connecting Johannesburg, Pretoria, and Oliver Tambo International Airport, and is a benchmark fast commuter railway in Africa. Alstom will build 8 new four car high-speed trains, which will be locally produced at the Nigel Ubenye factory in Gauteng province. At the same time, the existing 24 trains will be renovated, and the fleet size will be expanded to 32 trains. The project will be equipped with new signals, communication updates for the entire line, and EPC engineering. Keywords: Gauteng trains, Alstom

Operation and maintenance empowerment area

The project period is fifteen years from September 28, 2026 to 2041. Alstom will also provide long-term maintenance, spare parts, and technical support. After the upgrade, the line capacity, frequency, and operating hours will be optimized, and the station security passenger information system will be improved to promote the integration of public transportation and rail transit. The project will cultivate local skills, expand the South African railway supply chain, and consolidate Alstom's position in the African rail transit market.Editor/Min Jing

Comment

Related articles

Transportation

CR Initiates Locomotive Procurement, Annual Equipment Investment Nears 60 Billion Yuan

10-20

Transportation

Ayishan Tunnel excavation exceeds 4000 meters

10-20

Transportation

Switzerland builds narrow gauge test line, Italian hydrogen trains test nearby

10-20

Transportation

Russia and Belarus launch preliminary research on Moscow Minsk high-speed railway

10-20

Transportation

Three National Highways Form China’s Golden Outer Ring Along Border and Coastal Zones

10-20

Transportation

CRRC Intelligent Rail's Kuching Experience Becomes a Model for Overseas Reference

10-19

Collect
Comment
Share

Retrieve password

Get verification code
Sure